Greywater Pit in Ontario: When a Class 2 System Is Legal
Cottages, saunas and sink-only bunkies. The flow limit, the sizing formula, the setbacks, and the mistakes that show up at re-inspection.
The short answer: A greywater pit is a Class 2 sewage system under Part 8 of the Ontario Building Code, and it is legal with a permit when it takes greywater only, the daily design flow is under 1,000 litres, and the bottom sits at least 900 mm above the high water table. Toilets never go into it. With pressurized water, a kitchen sink, shower and washer (900 L/day) is about all a pit can take.
Costs, permits, contractor vetting, and the owner-builder path — updated for the 2026 Building Code.
No spam. Straight talk from a builder.
Did you know you can design your own septic system?
Legally – as the owner, for your own property. Our designer does the Part 8 math, draws the site plan and cross-section, and fills the township forms.
Start here – free
2-minute Septic Check. Your flow, tank size, and risk level – plus what your lot is missing.
Homeowners – one project
Permit Package Builder – $99.99. Part 8 math, site plan, cross-section, filled township forms. Print and submit.
Ontario law lets you do that part yourself, on your own property. OntarioSepticDesigner.ca turns your answers into the same 26-page package the township clerk sees every day — calculations, drawings, forms, all of it.
What a Greywater Pit Is (and What It Is Not)
A greywater pit is the oldest trick at the Ontario cottage: a covered hole in the ground, lined with something open-jointed, that soaks up the water from your sinks, shower and laundry. In Building Code language it is a Class 2 sewage system, and yes, it can be completely legal.
It can also be the single most common reason an old cottage gets a deficiency letter. The difference between those two outcomes is about four rules, a flow limit, and whether anybody ever hooked a toilet to it.
The one rule that never bends: a greywater pit takes greywater only. The Code says a Class 2 system “shall be designed only for the treatment and disposal of greywater.” Greywater is water from kitchen sinks, tubs, showers, washing machines and laundry tubs. Anything with human waste in it is not greywater, no matter how clean the toilet looks.
The Five Classes of Sewage System in Ontario
Ontario sorts every sewage system into one of five classes under Part 8 of the Building Code (Article 8.1.2.1). Knowing which one you have tells you which rules apply.
| Class | What it is | Where you see it |
|---|---|---|
| Class 1 | Privies and toilets that need no plumbing: pit, pail, vault, chemical, incinerating, composting, portable | Outhouses, composting toilets at off-grid camps |
| Class 2 | Greywater system (the greywater pit) | Cottages without pressurized water, saunas, sink-only bunkies |
| Class 3 | Cesspool | Rare today; one place a Class 1 system’s excess liquid may drain |
| Class 4 | Septic tank or treatment unit with a leaching bed | Nearly every year-round house. See our Class 4 guide |
| Class 5 | Holding tank, pumped and hauled away | Lots that cannot take a bed. See our holding tank guide |
The pairing that matters for cottages is Class 1 plus Class 2: an outhouse or composting toilet for the human waste, and a greywater pit for the dishwater and shower. The Code keeps them separate on purpose. A Class 1 system is designed to receive only human body waste, and if it has a drain for excess liquid, that drain has to go to a Class 3, 4 or 5 system — not to the greywater pit (Tay Valley Class 1 guideline).
When Is a Greywater Pit Legal?
Here is the checklist we would run before anybody picks up a shovel. Miss one and the pit is either illegal or about to fail.
- Greywater only. No toilet, no urinal, no composting-toilet leachate.
- Under 1,000 L a day. A pit is only allowed where the daily design flow is less than 1,000 litres (North Bay-Mattawa CA Class 2 sheet).
- At least 900 mm above the high groundwater table. Thunder Bay District Health Unit applies the same 900 mm to bedrock.
- Surrounded by 600 mm of decent soil. At least 600 mm on all sides and below, with a percolation time under 50 minutes.
- A permit. A Class 2 system treats and disperses sewage, so it is inspected and approved under the Building Code. Your township, health unit or conservation authority issues it.
Note what is not on the list: running water. The Code allows a pit with pressurized water. It just counts the flow higher, and that is where most cottages hit the wall.
Greywater Pit Sizing: The Two Numbers That Decide Everything
Sizing starts with flow. The Code counts fixture units and multiplies: 200 L per fixture unit with pressurized water, 125 L per fixture unit without it (Article 8.4.1.2). Kingston’s Class 2 form lists a tub or shower, clothes washer, laundry tub and each sink at 1.5 fixture units, and a dishwasher at 0.5 (City of Kingston Class 2 form).
Now watch how fast pressure eats your budget:
| Fixtures | Fixture units | With pressure (200 L) | Without (125 L) |
|---|---|---|---|
| Kitchen sink + shower | 3.0 | 600 L/day | 375 L/day |
| Kitchen sink + shower + washer | 4.5 | 900 L/day | 563 L/day |
| Add a bathroom sink | 6.0 | 1,200 L/day — too big for a pit | 750 L/day |
So a hand-pump cottage can run four fixtures into a pit. The same cottage with a pressure tank and a bathroom vanity is over the limit and needs a different system. Thunder Bay District Health Unit goes further and recommends a pit only where there is no pressurized water at all.
The second number is the soil. The pit is sized on its sidewall area, not its volume. The loading rate is LR = 400 ÷ T, where T is the soil’s percolation time in min/cm, and the required sidewall area is the daily flow divided by LR. The North Bay-Mattawa sheet works an example: 900 L/day in T = 10 soil gives LR = 40, so you need 22.5 m² of sidewall. A pit 1.0 m deep, 5.5 m long and 6.0 m wide gives 23.0 m².
Run the same formula on the hand-pump sauna (sink plus shower drain, 375 L/day) in the same soil and you need about 9.4 m². A pit 1.0 m deep and 2.4 m square gives 9.6 m². That is a worked illustration, not your design. Your T-time comes from a soil test, and our T-time guide explains how it is measured.
Kingston’s form says pit depth is commonly 1 metre, and Thunder Bay’s guide caps the excavation at 1.25 m. Going deeper usually just gets you closer to the water table you are supposed to stay 900 mm above.
How It Has to Be Built
Article 8.4.2.1 is short, and every line of it is something an inspector can see:
Clearances for a greywater system are shorter than for a leaching bed, but they are not zero. Leeds and the Thousand Islands publishes this summary for Class 1 privy vaults, pail privies and Class 2 greywater systems (source):
| To | Greywater pit | Cesspool (for comparison) |
|---|---|---|
| Well with watertight casing to 6 m+ | 10 m | 30 m |
| Any other well, or a spring used for drinking water | 15 m | 60 m |
| Lake, river, pond, stream, reservoir | 10 m | 15 m |
| Property line | 3 m | 3 m |
Those are minimums. Thunder Bay’s guide uses 15 m to any watercourse, and many lake townships add a zoning setback on top (Leeds and the Thousand Islands notes a 30 m watercourse setback in its zoning by-law). On a waterfront lot, the zoning number usually wins. Our setback guide and waterfront septic guide cover the rest.
Where Greywater Pits Fail at Re-Inspection
Re-inspection programs go looking for exactly this. Tiny lists “deficient grey water disposal” among the things its inspectors check. Dysart lists “greywater to grade” as a remedial action. Innisfil calls out outhouses in disrepair. Here is what that looks like on the ground:
- The pipe to nowhere. The sink or outdoor shower drains straight onto the ground or the rocks. That is not a Class 2 system. That is a fail.
- The sauna drain to the lake. Shower water from a sauna is greywater. Running it down the shoreline rocks is the fastest way to meet the inspector.
- No cover, or a rotten one. An open pit is a safety problem and a Code problem.
- The collapsed barrel. Rusted-out steel drums fill with soil and quit soaking up water. You see it as a wet spot that never dries.
- Too close. Pits dug in the 1960s at the water’s edge, or beside the dug well.
- The upgrade nobody permitted. A pressure system and a bathroom vanity added later, so the old pit is now taking more than 1,000 L a day.
- A toilet on the line. Somebody plumbed a flush toilet into it. This is not a deficiency, it is a new system.
The fix for 1 to 5 is usually a properly built, permitted pit in the right spot. The fix for 6 and 7 is a different system type altogether. If you are planning a bunkie or sleep cabin, read our bunkie septic guide before you run a sink to it.
The article numbers on this page come from the 2012 Building Code text. The 2024 Ontario Building Code (O. Reg. 163/24) took effect January 1, 2025. Check current wording on e-Laws or with your approval authority before you build.
Not Sure What Your Cottage Actually Has?
Take the free 2-minute septic check. It asks about your water supply, fixtures and site, then flags what to sort out with your township or health unit. If you already know the work needs doing, we can match you with a vetted local installer.
Sources: OBC 8.1.2.1 (buildingcode.online), North Bay-Mattawa CA Class 2 sheet, Thunder Bay District Health Unit Class 2 guide, City of Kingston Class 2 form, Leeds and the Thousand Islands clearances, Tay Valley Class 1 guideline. Final approval belongs to your local building department, health unit or approval authority.
Questions, answered straight
Is a greywater pit legal in Ontario?
Yes, as a permitted Class 2 sewage system under Part 8 of the Building Code. It must take greywater only, have a daily design flow under 1,000 L, and meet the construction and clearance rules.
Can I put a toilet into a greywater pit?
No. A Class 2 system is designed only for greywater, and any waste containing human body waste needs a Class 1, 4 or 5 system instead.
Do I need a permit for a greywater pit?
Yes. Class 2 systems are inspected and approved under the Building Code by the local approval authority, which may be your township, health unit or conservation authority.
How big does a greywater pit need to be?
It is sized on sidewall area. The loading rate is 400 divided by the soil’s T-time, and the required sidewall area is the daily flow divided by that rate, so 900 L/day in T = 10 soil needs 22.5 square metres of sidewall.
Can my sauna drain into a greywater pit?
Shower and sink water from a sauna is greywater, so a properly built and permitted pit can take it. Draining it onto the rocks or into the lake is a common re-inspection fail.
How far does a greywater pit have to be from the lake?
Leeds and the Thousand Islands lists 10 m to a lake or watercourse for Class 2 systems, Thunder Bay’s guide uses 15 m, and many townships add a 30 m zoning setback on top. Check your local zoning before you dig.
Keep reading
Types of Septic Systems in Ontario
All five classes and the system types that go with them, with real cost ranges.
Bunkies, Garden Suites and Septic
What happens to your septic approval when you add a sleeping cabin or suite.
Well and Septic Setbacks in Ontario
Code clearances to wells, lakes, buildings and lot lines, in plain English.