Peterborough County · Permits · 2026

Peterborough Septic System: Installation, Permits and Costs (2026)

Peterborough County and the City’s rural edge only: who reviews your septic permit now, what the ground does to your design, and what a new or replacement system really costs.

The short answer: Peterborough Public Health no longer issues septic permits. Since 2024 every township in Peterborough County, and the City, reviews its own, so you apply to the same building department that issues your house permit. Budget $25,000 to $40,000 for a conventional system on good till and more on wet ground, shallow rock or a tight waterfront lot (planning estimates).

FREE 2026 PDF

Homeowner’s Guide28 pp.

Costs, permits, contractor vetting, and the owner-builder path — updated for the 2026 Building Code.

No spam. Straight talk from a builder.

Did you know you can design your own septic system?

Legally – as the owner, for your own property. Our software does the Part 8 math, draws your site plan and cross-section, and fills in the township forms. You check it and sign it as the owner.

Start here – free

2-minute Septic Check. Your flow, tank size, and risk level – plus what your lot is missing.

Run the free check

Homeowners – one project

Permit Package Builder – $99.99 + HST. Part 8 math, site plan, cross-section, filled township forms. Print and submit.

Build my package – $99.99 + HST

1 Something’s wrong2 What it costs3 The permit4 Who designs it5 The paperwork6 Approval
The part nobody tells you
Designers charge $800–$2,000 just for the paperwork in these quotes.

Ontario law lets you do that part yourself, on your own property. OntarioSepticDesigner.ca turns your answers into the same 26-page package the township clerk sees every day — calculations, drawings, forms, all of it.

Look inside a real package →

Peterborough septic system permits: who actually signs off now

If you read an older article that says Peterborough Public Health handles septic permits, it was right for about 40 years. It is not right anymore, and sending your application to the wrong office is a slow way to start a job.

In 2024 Peterborough Public Health handed its sewage system program to the local municipalities. Selwyn, Cavan Monaghan, Otonabee-South Monaghan and Trent Lakes took over new applications on April 1, 2024. Asphodel-Norwood, Havelock-Belmont-Methuen and the City of Peterborough took over in November 2024. Douro-Dummer and North Kawartha already ran their own programs, so nothing changed there. (Selwyn Township notice)

So the rule of thumb for any Peterborough septic system is simple: your septic permit now comes from the same building department that issues your house permit. If you pay your taxes to it, you apply to it.

Municipality Who reviews septic permits Local notes we could confirm
City of Peterborough (rural edge lots on septic) City of Peterborough building services Took over in November 2024. Applications go to residentialpermits@peterborough.ca, before or with the building permit. (City septic page)
Selwyn (Lakefield, Bridgenorth, Ennismore) Selwyn Township Building Department Since April 2024. Publishes a sewage system guide and application (Feb 2026 edition) with a full checklist.
Douro-Dummer Township of Douro-Dummer Ran its own program before the transfer. Renovation or change of use review: $250. Copy of an old permit: $45.
Otonabee-South Monaghan (Keene) Township Building Department Since April 2024. Its guide spells out exactly what the site plan must show (more below).
Cavan Monaghan (Millbrook) Township Building Department Since April 2024. The septic permit is a required attachment to the building permit, filed through Cloudpermit.
Asphodel-Norwood Township building department Took over in November 2024. Call the township office for current forms and fees.
Havelock-Belmont-Methuen Township of Havelock-Belmont-Methuen Took over November 17, 2024. Applications through Cloudpermit; fees on the township Sewage Systems page.
North Kawartha (Apsley) Township building department Ran its own program before the transfer. Copy of an existing system record: $100.
Trent Lakes (Buckhorn) Municipality of Trent Lakes Since April 2024. Existing-use alteration review: $500. Records search: $35. Records go back to 1976 (not every lot has one).

This page covers Peterborough County and the City’s rural edge only. If your property is in the City of Kawartha Lakes (Lindsay, Bobcaygeon, Fenelon Falls, Omemee and the rest), that is a different authority with its own rules. Read our Kawartha Lakes septic guide instead. Systems over 10,000 litres a day are a different animal too: those go to the province (MECP) for an Environmental Compliance Approval, not the township.

Septic permits in Peterborough County: who reviews your application

A township building official reviews it, usually the Chief Building Official or a sewage system inspector. They check it. They don’t draw it for you. Otonabee-South Monaghan’s guide says it plainly: "A building inspector will not design a sewage system." The design comes from you (as the owner, on your own property), a qualified designer, an installer with design qualifications, or an engineer.

What stalls files is almost never a bad bed. It’s a missing page. Selwyn and Otonabee-South Monaghan publish nearly identical checklists, and the other townships ask for the same things under different names. A complete application contains:

1The form and schedules — Application for a Permit to Construct or Demolish, Schedule 1 (designer information) signed by the designer, Schedule 2 (installer information) signed by the installer, and an authorization form if someone else is applying for you.
2Design worksheets — daily design flow, tank size and bed sizing. The bedroom count and finished floor area must match your house drawings, because the inspector will compare them.
3Test-hole logs and T-time — soil layers by depth, water table, bedrock or refusal, and the percolation time from a soil testing lab. Our test hole guide shows what a usable log looks like.
4A scaled site plan with setbacks and reserve area — tank, bed, pump chamber, every building, pool, well (yours and the neighbours’), lake or stream, lot lines, easements and utility corridors, with the clearances marked. Show where a future replacement bed would fit.
5A cross-section — original and finished grade, native soil, imported sand, stone, pipe, and the high water table and bedrock lines with the vertical separation dimensioned. Here is how to draw one an inspector can read.
6Approvals and the fee — the CAN/BNQ or BMEC approval for any treatment unit, and the permit fee. Each township sets its own fee in its fee by-law, so ask for the current number.
Adding on? Read this first

Selwyn and Otonabee-South Monaghan both require a septic review before a building permit if you add bedrooms, add fixtures, change the use, or grow the finished floor area by more than 15%. That finished basement with a guest room counts. Apply for the septic side before or with the building permit, not after.

Ten-minute shortcut

Ask the township for its own package before anyone draws anything. Trent Lakes will email its full sewage information package (forms, fee list, site plan rules, site visit expectations) if you write to development@trentlakes.ca. One phone call costs less than one resubmission.

What the ground is like around Peterborough

Peterborough County is really two countries with a chain of lakes down the middle, and your septic bill depends on which one you’re standing in.

South and centre: drumlins and till

Most of the county around the city sits in the Peterborough Drumlin Field: long glacial hills, steep on one end, that all point south-southwest. They are made of till, which is the glacier’s leftovers, soil and rock mixed together and dragged down from the north. Limestone sits underneath.

Till is honest about one thing only: it changes. One drumlin back drains nicely and takes a conventional bed. The low ground between two drumlins can sit wet every spring. It is normal for two test holes 30 metres apart to look like they came from different townships.

North: the Shield

Stony Lake straddles the boundary between the Canadian Shield and the lowlands. North of that line, through most of North Kawartha, northern Trent Lakes and parts of Havelock-Belmont-Methuen, you get granite with pockets of thin soil. When the test hole hits rock at two feet, the bed has to be built up on imported sand instead of dug down into native soil. Our shallow bedrock guide explains why.

The lakes

Chemong, Buckhorn, Stony, Lovesick, the Otonabee River and the north shore of Rice Lake hold a lot of small, old cottage lots with systems nobody has looked at in decades. If you’re on the south shore of Rice Lake, you’re in Northumberland County; see our Northumberland septic page.

Before you pay anybody, do this:

  1. Walk the bed area in April, not August. Standing water and squishy grass in spring tell you more than a dry summer ever will.
  2. Have the test holes dug where the bed will actually go, not wherever the excavator happened to park.
  3. Find every well within 30 metres, including the neighbours’. Unknown wells are the most common surprise on small lots.
  4. Ask the township for any old permit file on your property. It may show the original bed location and soil.

What systems get built here

There is no Peterborough standard system. Your test holes and your lot size decide. That said, the patterns are pretty steady:

Where Typical ground What usually gets built
Drumlin uplands (Otonabee-South Monaghan, Cavan Monaghan, Douro-Dummer, Asphodel-Norwood, south Selwyn) Till, from sandy to clay-rich Conventional trenches on the better till; filter beds or partly raised beds where it is tight
Low ground between drumlins, river flats High seasonal water table Raised bed on imported sand to get the separation the code needs
Shield country (North Kawartha, north Trent Lakes, north Havelock-Belmont-Methuen) Thin soil on rock Raised beds built up on imported sand; advanced treatment where there is no room
Small waterfront lots on any lake Little room, wells close by Advanced treatment unit with a smaller bed, when the setbacks won’t fit anything else

The difference between a conventional bed and a raised bed is mostly trucks of sand. If you want the long version, read raised bed vs conventional.

What a Peterborough septic system costs in 2026

Here are the ranges we use for planning. They are not quotes. A Shield lot with water access only will beat the top of these numbers without trying.

Good till, room to work

Conventional system

$25,000 – $35,000

Tank and in-ground trenches. Planning estimate.

Wet ground or shallow rock

Raised or filter bed

$30,000 – $50,000

Imported sand, more machine time, more grading. Planning estimate.

Tight waterfront or Shield lot

Advanced treatment

$35,000 – $65,000+

Treatment unit plus a smaller bed, and ongoing service. Planning estimate.

Other line items Planning estimate
Pump-out $300 – $600, every 3 to 5 years
Septic inspection $200 – $900
Old record search $35 (Trent Lakes), $45 (Douro-Dummer), $100 (North Kawartha)
Township permit fee Varies by township and system type; check the fee by-law

What pushes Peterborough jobs up: trucking sand a long way up north, grading on a drumlin slope, removing trees on a treed cottage lot, and water-only access (a barge is not cheap, and neither is waiting for the lake to calm down). What brings them down: a clean test hole, room for the bed, and a design every quoting installer prices the same way.

Waterfront lots: conservation authorities, Parks Canada and inspections

On a lake lot the township is not the only office with a say. Three conservation authorities cover Peterborough County. Otonabee Conservation covers the central Otonabee River watershed. Kawartha Conservation counts Trent Lakes and Cavan Monaghan among its members. Crowe Valley covers Havelock-Belmont-Methuen and North Kawartha. If you work in or near a lake, stream, wetland or floodplain, you may need their permit under Ontario Regulation 41/24 as well. (Otonabee Conservation permits)

The Trent-Severn Waterway adds a twist. Below what Otonabee Conservation calls the Upper Controlled Navigation Limit, in-water and shoreline permits belong to Parks Canada, not the conservation authority. Ask both offices before you book a machine.

The Building Code floor is 15 metres from a lake, river or stream to the tank and to the distribution pipe, 15 metres from a well with a watertight casing at least 6 metres deep, and 30 metres from any other well. Zoning can ask for more. Our waterfront septic guide covers how that plays out on a 50-foot lot.

Re-inspections

Trent Lakes requires inspection every five years in Alpine Village and Buckhorn Lake Estates, which are vulnerable areas under the source protection plan. (Trent Lakes septic page) North Kawartha has run a sewage system maintenance inspection program since 2014 on a five-year cycle, done as visual inspections in summer. We could not confirm a current program in the other townships, so ask yours.

How to pick an installer around Peterborough

The installer signs Schedule 2 on your application, so pick one before you file, not after. A good one will also tell you, politely, when your bed location is a bad idea.

  1. Ask for their BCIN registration and the name of the qualified person on the job. Here is what licensed means in Ontario.
  2. Ask how many systems they put in in your township in the last two years. Local installers know the inspector and the soil.
  3. Get two or three prices on the same design. Quotes on different designs can’t be compared, which is why they look so far apart.
  4. Check what each quote includes: permit, design, test holes, decommissioning the old tank, sand, final grading, topsoil and seed.
  5. Ask who books the inspections. The township wants to see the bed open before backfill, and a covered bed that missed its inspection gets uncovered.
  6. Don’t hand over a big deposit before the permit is issued.

Building or replacing a septic system in Peterborough County?

Get matched with a vetted installer who works your township, or run the free 2-minute septic check first to see your design flow, tank size and the red flags on your lot.

Sources: Selwyn Township, PPH program transfer; PTBOCanada, transfer timeline; Selwyn sewage system guide; Otonabee-South Monaghan septic forms; Douro-Dummer sewage permits; Havelock-Belmont-Methuen; North Kawartha; Trent Lakes; City of Peterborough; Otonabee Conservation; OBC Table 8.2.1.6.

Questions, answered straight

Does Peterborough Public Health still issue septic permits?

No. Peterborough Public Health transferred its sewage system program to the local municipalities in 2024, finishing in November 2024. Apply to your township or the City of Peterborough building department.

How much does a septic system cost in Peterborough County in 2026?

As planning estimates, a conventional system runs about $25,000 to $40,000, a raised or filter bed about $30,000 to $50,000, and an advanced treatment system $35,000 to $65,000 or more. Shield rock, slopes and water-only access push the number up.

Can I design my own septic system in Peterborough County?

An owner can prepare the design for a system on their own property, and township guides list the owner as one of the people who can do it. It still has to meet Part 8 of the Ontario Building Code, and the township building department decides whether to issue the permit.

Do I need a conservation authority permit for a septic system near the lake?

Possibly. Work in or near lakes, streams, wetlands or floodplains can need a permit from Otonabee, Kawartha or Crowe Valley Conservation under O. Reg. 41/24, and below the Trent-Severn controlled navigation limit Parks Canada handles in-water and shoreline permits. Call before you book a machine.

Is there a mandatory septic re-inspection program in Peterborough County?

Trent Lakes requires inspection every five years in Alpine Village and Buckhorn Lake Estates, and North Kawartha has run a five-year maintenance inspection program since 2014. Ask your own township whether your area is included.

My cottage is in the City of Kawartha Lakes. Does this page apply?

No. The City of Kawartha Lakes is a separate municipality with its own septic program and rules. Use our Kawartha Lakes septic system page instead.

Ontario Septic Watch

Written by a builder doing building and septic work in Simcoe County since 1979. Cost figures are planning estimates only; actual pricing depends on suppliers, trucking distance, local labour and site conditions. Final approval belongs to your local building department, health unit or approval authority.

Keep reading

Next door

Kawartha Lakes Septic Systems

Lindsay, Bobcaygeon, Fenelon Falls and the rest of the City of Kawartha Lakes: permits, soils and costs.

Permits

Septic Permits in Ontario

How the Part 8 permit process works anywhere in Ontario, from test holes to final inspection.

Costs

Why Septic Quotes Vary

Why two installers can be thousands of dollars apart on the same lot, and how to compare quotes fairly.